Crisp, clear weather today for setting the solar array poles.
Read on.
The 20 ft galvanizd pipe each weighs 850 lbs.
Booming the poles into place.
The poles were plumbed and held in place by temporary guide wires. Reinforcing rod was installed and internal electrical wire holding conduit were toggled into the poles.
6.5 yards of concrete were wheel barrowed into the pit by the HALCO crew and myself along with the 'Bob Cat's' help.
The two poles will each hold a 10x20 ft. adjustable rack of 16 solar panels.
Looks like we have a mole problem in our lawn where the under ground conduit has been placed.
Stay tuned.