In this blog most of what I share reflect my efforts to think globally and act locally.
Saturday, July 14, 2012
Saturday, May 5, 2012
Locating the Wicked Leak
Early last winter I began to notice that the water pump was turning on about every 30 minutes so added it's repair to my "to do" list, but have procrastinated to do any thing about it. In January, with the help of my brother we pulled the well pump and replaced a defective checkvalve.
Since I am a light sleeper after 2 am and the "clicking" on/off water pump switch is in the basement below our bed room I could now hear the pump clicking on every 20 minutes. We pulled the pump again to check for leaks and even pressurized the line from the well head to the check valve and the pressure held! The in well line was not the source of the leak.
At the ground surface there were no wet areas that would indicate a leak. I started isolating various lines within the house - the pressure holds. Isolated the pressure tank - the pressure holds.
Next I thought about the hydrant into the log barn and dug it out.
"All right!" I said to my self. I am going to cut the water line to the barn and pond hydrants. So I dug a 4th hole to find the juction of the main water line and branch to the barn/pond hydrants. I cut the line and "walah!" ... the pump was still clicking on every 20 minutes. What!!#@*!!!
I dig out the well head and expose the branch line to the garden hydrant.
The "wikileak" is in this line. It's repair will involve digging up the hydrant and starting there to seal the leak.
Since I cut each branch line from the main water line I decided to install a shut off valve that I can open/close using a long handled extension to isolate, locate and repair future leaks should they occur.
Ahh! ...problem solved or was it?
Since I am a light sleeper after 2 am and the "clicking" on/off water pump switch is in the basement below our bed room I could now hear the pump clicking on every 20 minutes. We pulled the pump again to check for leaks and even pressurized the line from the well head to the check valve and the pressure held! The in well line was not the source of the leak.
At the ground surface there were no wet areas that would indicate a leak. I started isolating various lines within the house - the pressure holds. Isolated the pressure tank - the pressure holds.
So where is this 'wikileak'???
After a few more months and recovery from my burned foot (See blog entry for April 1st "Amputation" ), I decided to become a mole, grave digger, or just a crazy man with a round pointed shovel and find this "wicked leak". Our water line from the well has two branch lines to a hydrant near the garden and another at the barn/pond. I've never been very confident in my plumbing of the pond side hydrant, so I dug holes there first. No leak here that I could see.
Two 4.5 ft holes at the pond hydrants. The water table is only 4 ft down here. ...remind you of WWI? |
Hole to log barn hydrant ...still no leak?! |
"All right!" I said to my self. I am going to cut the water line to the barn and pond hydrants. So I dug a 4th hole to find the juction of the main water line and branch to the barn/pond hydrants. I cut the line and "walah!" ... the pump was still clicking on every 20 minutes. What!!#@*!!!
The 4th hole at the junction of the main line an line to the barn/pond hydrant. |
Okay ... so now what?
Is the "pitless" at the well head leaking?
Is the most recent hydrant set by the garden leaking?
I dig out the well head and expose the branch line to the garden hydrant.
Main water line and branch to garden hydrant. |
Well head. Hole #5. (It only took me 1.5 hours to dig this 2.5x6x5 ft hole ...need a grave anybody? -or- maybe my own!) |
Since I cut each branch line from the main water line I decided to install a shut off valve that I can open/close using a long handled extension to isolate, locate and repair future leaks should they occur.
Brass shut off valve cased in using cinder blocks. |
PCV pipe will allow a 5' handle to open/close the shut off valve to branch lines. |
Well head and shut off pipe. |
...so what if I had installed shut valves on each branch line during the original construction?
Tuesday, April 17, 2012
Peas On Earth, With Good Compost to Amend!
Sunday, April 1, 2012
Amputation
Below are several pictures of the burned foot.
They are not pleasant to look at, so viewer beware.
4 hours after the hot water burn |
24 hours |
36 hours |
Now two weeks later I would like to give blog followers an update.
After five days of self treating I went to the emergency room at our local hospital. The ER physician treated the wound and insisted that I contact the burn unit at the University of Rochester's Strong Hospital.
As you can see the burn was a very serious burn and because I had waited over a week to seek medical help the foot was amputated just above the ankle...Yes, AMPUTATED!
...read on!
April Fool's!
OKAY ... so what really happened?
I did seek medical help from the Krasser Burn Unit at Strong Hospital in Rochester, where Dr. Bell and his staff using general anesthesesia:
1. debrided the granular tissue forming in the central 3rd degree burn area of the foot.
2. took a partial skin graft (a 2x4 sized segment) from my upper thigh and attached it to the 3rd degree burn area of the foot. A very high tech vacuum pump drained any liquids from the wound as well as providing negative pressure to secure the graft to the sub-dermis, insuring a good generative dermis to dermis contact for optimal growth.
7 days post burn/pre-skin graft. You can see the 3rd degree burn (whitish tissue) in the central area. |
I changed the wound dressing each day.
You can see the healing progress in the next few photos.
The skin graft site on my upper thigh. Doctors wanted the graft covered and open to the air so that a dry scab would form where it will crumble off with time. |
Monday, March 12, 2012
Accidents
Last Friday my wife dropped me off south of Hammondsport, NY to backpack along the Finger Lakes trail to Ithaca, NY, 85 miles east by the Finger Lakes Trail. I was making good progress each day, braving snow squalls and some cold night in shelters along the trail. With three days of trekking and 60 plus miles under my belt I was feeling confident about finishing the remaining 22 miles on the last planned hiking day.
Below are a couple of short video clips that give you a brief appreciation of trail hiking.
(Turn up your sound.)
Friday - 3/9 on the trail above Hammondsport.
It's Spring!
Steep trail.
Saturday evening at the Roger's Hill Lean-To, after 27 miles of backpacking for the day; I was fixing myself a cup of hot soup, very pleased with my progress and only one more day before reaching my goal "pull out" point of Ithaca, NY. As I was pouring the boiling water into a my cup the pot jiggled loose from the handle spilling boiling water onto my sock covered foot. I immediately pulled the sock off and poured cold water on the injury.
Too late the damage was done and the hike was over.
(Fortunatly with the warm evening a local ATV rider was able to help transport me to a rendezvous spot where my wife could pick me up.)
...so here I sit dispite all the rational thoughts; trying to sort this out in my mind to bring some closure to this issue.
Why !!?
Accident - Any unpleasant or unfortunate occurence involving injury, loss, suffering, or death; a casualty; mishap. - as defined by my old Funk & Wagnalls dictionary.
Caution!
... viewer discretion advised.
Friday, March 9, 2012
Top Loading/Bottom Unloading Vermicompost Bin
I have been vermicomposting our kitchen waste for over two years. Originally I converted an old guinea pig box into a worm bin. This worked until I tried removing the finished vermicompost, involving the separation of decomposing layers of kitchen waste in order to get at the finished vermicompost. Red worms also had to be removed by hand and returned to the bin in order to access the finished vermicompost. An entirely too messy process to be taking place in my basement. So this is a rather long post sharing my home made, self designed vermicoposting bin.
If you are still interested, read on.
If you are still interested, read on.
An informal drawing of the homemade, top loading/bottom unloading vermicompost bin on wheels. (click on the diagram to see a larger picture of the drawing) |
The homemade, portable top loading/bottom unloading vermicompost bin. |
The plastic lined bin has a turnable "tickler" rod at the bottom of the bin, enabling finished vermicompost to be unloaded from the bottom of the bin.
|
The trommel screening drum is rotated forward and backwards with the screened vermicompost falling into the sloped collecting tray underneath. Since the vermicompost tickled off the bottom of the bin is quite damp, screening is repeated over several days.
(Double clip on the video picture to see a full screen view.)
I cover the bin with newsprint that allows me to keep the bin open, yet dark
for worm activity. The bin is then covered with a meshed garden cloth.
(Double clip on the video picture to see a full screen view.)
I monitor the bin for odors everytime I walk through the basement. Like any active composting process, success often depends on the WONC ratios (water/oxygen - 1 nitorgen/ 3 carbon ratios) by adding more shredded newspring (adding carbon and/or absorbing water) and stirring to move the contents to a more aerobic (with oxygen) vs anaerobic (with out oxygen = unacceptable odor) condition.
Sunday, March 4, 2012
Gone To Pick Up the Sunday Paper.
I have always liked physical exercise. Back in the 70's and very early 80's I ran competive road races including the Boston Marathon multiple times with fair amount of success. By 2009 - age, time and expense (clothing, shoes, race fees, travel, etc) make walking on local roads the ideal aerobic exercise for me. Sundays are my usual "big" walking days in order to make my weekly goal of 30 miles.
Today's walk shown below is a typical loop, requiring about 4 hours to complete.
The google map marks today's 15.42 mile walking loop. |
Saturday, February 25, 2012
Relief ='s two new totems
On March 27, 2010 I wrote about carving animal totems where several log butts protruded from an interior wall in our log house. At that time I completed three of the five log ends.
[Click on the link below to see that particular blog entry]
The two unfinished log butts are above the beaver, bear, and turtle heads |
For the past few days I have intermittently been working to finish the project started in 2010 with a sharp pruning saw, hand chisels, a rasp, sand paper and my imagination.The original intent (1983) was to create a totem pole affect using NY state animals to entertain our kids as they went up and down the stairs while growing up. Unforturnately for the creative side of life, this relief intent was shelved due to the demands of the work world.
Hurray for the "tiring" work of retirement!
A frog and a canadian goose were released from top two log ends. |
When I asked my visiting grandson "What he saw?"
he guessed the frog correctly,
...but when asked about the top figure he said;
"A penquin?"
You know - he might be right!
It does look like a flying "penquin".
'Chendrashaker'
Thursday, February 23, 2012
Monday, February 13, 2012
...in Hot Water
In October we had HALCO (http://www.halcoheating.com/) install a direct solar hot water system on our new roof. The goal is to reduce our annual propane use by 50%.
How it works:
An antifreeze solution is pumped through two solar collector panels on the roof. This fluid is then pumped through a coil inside of a large water storage tank located next to our existing propane hot water tank. If the solar panel temperature is 10 degrees higher than the storage tank bottom's water temperature, a circulating pump turns on. Heat from the solar heated solution is then transferred by conduction and convection within the storage tank. When we turn a hot water faucet on for showers, dish washing or laundry; preheated water from the top of the storage tank enters our existing hot water tank, reducing the amount of propane needed to raise well water to 120 degrees Fahrenheit.
The following video clip was taken later (5:35 PM) as the sun is now lower in the western sky. As you can see, the solar panel temperature is down (47 F), but the temperature at the top of the storage tank is 97.8 degrees Fahrenheit. Water entering the hot water tank will only have to be heated 23 degrees vs 57 degree water coming directly from the well under the old system.
We will be watching our propane bills, so check back in a few months.
How it works:
An antifreeze solution is pumped through two solar collector panels on the roof. This fluid is then pumped through a coil inside of a large water storage tank located next to our existing propane hot water tank. If the solar panel temperature is 10 degrees higher than the storage tank bottom's water temperature, a circulating pump turns on. Heat from the solar heated solution is then transferred by conduction and convection within the storage tank. When we turn a hot water faucet on for showers, dish washing or laundry; preheated water from the top of the storage tank enters our existing hot water tank, reducing the amount of propane needed to raise well water to 120 degrees Fahrenheit.
Two solar hot water panels. |
Air temperature - 38 Faherenheit in the shade. |
The inhouse temperature probe (left) and various pressure gages for easy system monitoring. |
The above video clip was taken at 2:30 PM local time.
- The 1st number is the temperature of the antifreeze solution in the panels on the roof. (121 F)
- The 2nd number is the temperature at the bottom of the water storage tank. (102 F)
- The 3rd number is the water temperature at the top of the water storage tank, which feeds our existing gas heated hot water tank. ( 89 F)
As you can see the water entering our hot water tank is preheated by the sun. Before the solar water heating system was installed, 56 - 57 degree Fahrenheit well water would enter our hot water tank and then have to be heated with propane to 120 degrees Fahrenheit.
The following video clip was taken later (5:35 PM) as the sun is now lower in the western sky. As you can see, the solar panel temperature is down (47 F), but the temperature at the top of the storage tank is 97.8 degrees Fahrenheit. Water entering the hot water tank will only have to be heated 23 degrees vs 57 degree water coming directly from the well under the old system.
We will be watching our propane bills, so check back in a few months.
Friday, January 27, 2012
Screening 2010 Leaf Compost
Yard leaves are a terrific source of soil amending compost. Each fall I rake and collect yard leaves into a large pack pile. In our yard the leaves consist of black walnut, white ash, a variety of maples, red oak, and shrub leaves. Below are several photos and video clips of the finishing process for the 2010 leaves into a fine compost that will be added to this springs (2012) vegetable garden.
Removing materials that did not pass through the screen for further screening and/or recomposting.
Sunday, January 15, 2012
Two Interesting Winter Reads
Just finished reading The American Chestnut: the Life, Death and Rebirth of A Perfect Tree by Susan Freinkel. An interesting read that tells the historical story of the American Chestnut tree and the on going decades effort to restore this tree, that was long gone by my birthday. For a review, click on the link below.
The other evening while watching the PBS News Hour I heard Karl Pillemer, Ph.D., (researching gerontologist/Cornell University) give a review of his new book 30 Lessons for Living - Tried and True Advice from the Wisest Americans. You can listen to the interview by clicking on the link below.
The other evening while watching the PBS News Hour I heard Karl Pillemer, Ph.D., (researching gerontologist/Cornell University) give a review of his new book 30 Lessons for Living - Tried and True Advice from the Wisest Americans. You can listen to the interview by clicking on the link below.
Both of these books are available in our local Pioneer Library System at: http://www.owwl.org/
...check them out. They are good winter reads!
Sunday, January 1, 2012
2011 Notables on the Home Front
Yesterday, I took a little time to review some of 2011's accomplishments.
Here are ten in no particular order -
Here are ten in no particular order -
- Walked 1,541 local miles ...average = 4.2 miles/day & collected $69.70 for roadside deposit cans...primarily beer cans. ...so why are Gatorade, Vitamin drinks , Brisk Tea, and chocolate milk product bottles NOT returnable? Got to look into this one.
- We drove 1000 miles less this year than last year...let's see @ $.40/mile that is a savings to say nothing of the into town errands saved by walking instead.
- $8.36 - the amount of loose change found along side of the roads while walking ...I also found over a dozen, unopened cans of beer ...??? Yes, I know your next question.
- The Photo Voltaic system generated 8033 kilowatt hours of electricity or over 100% of our electric power needs for 2011 ... enough energy to light 803, 100 watt incandescent bulbs for an hour...right? Oh, incandescent bulbs will soon be history.
- Turned and screened 6 cubic yards of finished compost that was used in our garden & flower beds ... that is roughly 6000 calories figuring 300 Calories/hour x 20 hours of turning, screening and loading/spreading.
- Collected conservatively 10+ tons of field stone from roadsides, hedges, and the work areas at local cemeteries (NO! not head stones!! ...lets see now ...80 wheel barrow loads @ 250 lbs/load...) used to build a pond and free standing stone walls.
- By recycling & composting, we are averaging 0.4 lbs/person of solid landfill waste/day. (...the national average is 4 lbs/person of solid landfill waste/day.)
- Volunteered 383 hours over the past year ...or 7.4 hours/week.
- We have not purchased any vegetables, salad greens, jams or honey in 2011 ...thinking globally, but acting locally.
- I've read 25 books from the local library system. (...mostly non-fiction, many from the NYT bestseller list.)
...It is on to the New Year!
Think I will go for a three hour walk before the rains come today.
Subscribe to: