Tuesday, April 27, 2010

Solar Array Set Up - Day 2

Today was spent laying the plastic conduit from the house to the solar array site. This was followed by back filling the trench. As you can see April showers were big wet flakes of snow. Melissa and Ralph (HALCO) set up a electrical distribution box between the two array towers, then hung an electrical panel board in the basement before heading back to prep materials for Day 3.
Tomorrow: Tower poles will be set up, a concrete base will be poured, an electical wire will be pulled through the conduit, and the solar panels will be brought on site.
Stay tuned.
Conduit pipe will enter the back of the house.
Ralph and Melissa glue pipe, then we backfilled the trench.

No comments:

Post a Comment